There are three areas in the City that will have publicly bid work performed this spring/summer. Ferry Drive, Ford Court Area Parking Lot, and Circle Drive. Currently, these projects will be bid out in March, and should be under construction by the end of April.
FERRY DRIVE
· Full replacement of asphalt and base course from the Bartle’s Beach bridge, north to Prospect Street.
· Spot replacement of curb and gutter and sidewalk
· Replacement/repair of sanitary sewer
· The existing terrace slopes are currently expected to remain unchanged for most of the project.
FORD COURT AREA PARKING LOT
· Replacement/relocation of sanitary sewer between Ford Court, Water Street, and Main Street.
· Reconstruction of storm sewer as necessary.
· Replacement of existing asphalt and base course in alley’s and parking lot to improve drainage.
· Reconstruction of Water Street, Main Street, and Ford Court is not part of this project.
CIRCLE DRIVE
· Installation of a dry detention basin at the west end of the street. The existing right-of-way extends well outside the asphalt of the street.
· Installation of new storm sewer out to Rock Lake from the detention basin.
· Grades in the area south of the Circle Drive turnaround, then west to Rock Lake will generally be close to where they are today. With the exceptions of the basin location and storm sewer run which will be depressed.